Difference between revisions of "Costs of solutions"

From FIThydrowiki
Jump to navigation Jump to search
Line 1: Line 1:
''Note: the info on this page is temporary, for demonstration purposes'' [[file:broken]]
+
'''Note: the info on this page is temporary, for demonstration purposes''' [[file:broken]]
  
 
One of the goals of the FIThydro project is to determine the financial costs of implementing mitigation measures (solutions).  
 
One of the goals of the FIThydro project is to determine the financial costs of implementing mitigation measures (solutions).  

Revision as of 08:35, 5 August 2020

Note: the info on this page is temporary, for demonstration purposes File:Broken

One of the goals of the FIThydro project is to determine the financial costs of implementing mitigation measures (solutions).

Library of possible measures Min Max Unit
[Euro] [Euro]
Habitat Instream habitat adjustments Placement of spawning gravel in the river 10 100 per cubic meter
Placement of stones in the river 50 150 per cubic meter
Cleaning of substrate - ripping, ploughing and flushing 1 50 per square meter
Placement of dead wood and debris 10 150 per meter
Re-storing habitat Removal of weirs 2,000 1,000,000 per weir
Construction of a 'river-in-the-river' 50 5,000 per meter
Construction of off-channel habitats 1 100 per square meter
Shore-line habitat Environmental design of embankments and erosion protection 10 150 per meter
Restoration of the riparian zone vegetation 1 50 per square meter
Fish migration Downstream Migration barrier removal 2,000 1,000,000 per project
Operational measures (turbine operations, spillway passage) NA
Sensory, behavioural barriers (electricity, light, sound, air-water curtains) NA
Fish-friendly turbines 500,000 per turbine
Skimming walls (fixed or floating) 3,000 per m3/second
Bypass combined with other solutions 10,000 25,000 per m3/second
Fish guidance structures with narrow bar spacing 2,000 40,000 per m3/second
Fish guidance structures with wide bar spacing 2,000 40,000 per m3/second
Downstream fish protection system using electro shock technique
Bottom-type intakes (Coanda screen, Lepine water intake, etc.) NA
Other types of fine screens
Vertical slot fishways
Upstream Complete or partial migration barrier removal 2,000 1,000,000 per project
Nature-like fishways 5,000 20,000 per vertical meter
Pool-type fishways 10,000 100,000 per vertical meter
Baffle fishways 5,000 100,000 per vertical meter
Fishways for eels and lampreys 600 per meter length
Fish lifts, screws, locks, and others 10,000 500,000 per project
Truck transport NA
Sediment Rout-ing Drawdown reservoir flushing 1 50 per cubic meter
Sediment sluicing NA
Removal By-passing sediments NA
Off-channel reservoir storage NA
Mechanical removal of fine sediments (dredging) 5 10 per cubic meter
Minimizing the sediment arrival to the reservoir 150,000 per Vortex tube
Restoration in rivers Removal of bank protection NA
Debris removal NA
Environmental flow General flow regime Mitigating reduced annual flow and low flow measures
Mitigating reduced flood peaks, magnitudes and frequency
Short-term flow regime Mitigating rapid, short-term variations in flow (hydro-peaking operations)