Difference between revisions of "Template:Fish-friendly turbines"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Making templates for classification tables) |
||
| Line 4: | Line 4: | ||
|Fish species for the measure||[[Fish species for the measure::All]] | |Fish species for the measure||[[Fish species for the measure::All]] | ||
|- | |- | ||
| − | |rowspan = "3"|Does the measure require loss of power production|| | + | |rowspan = "3"|Does the measure require loss of power production||- |
|- | |- | ||
||- | ||- | ||
| Line 10: | Line 10: | ||
||- | ||- | ||
|- | |- | ||
| − | ||Recurrence of maintenance||[[Recurrence of maintenance:: | + | ||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]] |
|- | |- | ||
|rowspan = "6"|Which life-stage of fish is measure aimed at||- | |rowspan = "6"|Which life-stage of fish is measure aimed at||- | ||
| Line 60: | Line 60: | ||
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||
|- | |- | ||
| − | ||Level of certainty in effect||[[Level of certainty in effect::Very | + | ||Level of certainty in effect||[[Level of certainty in effect::Very certain]] |
|- | |- | ||
| − | ||Technology readiness level||[[Technology readiness level::TRL | + | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] |
|} | |} | ||
Revision as of 10:12, 28 October 2019
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | - |
| - | |
| - | |
| Recurrence of maintenance | Less often than yearly |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| - | |
| - | |
| Movements of migration of fish | |
| Which physical parameter is mitigated | N/A |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | - |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Very certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |