Difference between revisions of "Template:Operational measures (turbine operations, spillway passage)"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Making templates for classification tables) |
||
| Line 50: | Line 50: | ||
||- | ||- | ||
|- | |- | ||
| − | || | + | ||[[Section in the regulated system measure is designed for::Bypass section]] |
|- | |- | ||
| − | || | + | ||[[Section in the regulated system measure is designed for::Downstream outlet]] |
|- | |- | ||
| − | |rowspan = "3"|River type implemented|| | + | |rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
| Line 60: | Line 60: | ||
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||
|- | |- | ||
| − | ||Level of certainty in effect||[[Level of certainty in effect:: | + | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] |
|- | |- | ||
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||
|} | |} | ||
Revision as of 10:12, 28 October 2019
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | Operational (requires flow release outside turbine) |
| - | |
| - | |
| Recurrence of maintenance | Irregular at events |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| - | |
| - | |
| Movements of migration of fish | |
| Which physical parameter is mitigated | N/A |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| Bypass section | |
| Downstream outlet | |
| River type implemented | Bypass section |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Moderately certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |