{| class="wikitable" | {| class="wikitable" | ||
| + | ! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Fish lifts, screws and locks | ||
| + | |- | ||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- | ||
| Line 36: | Line 38: | ||
||- | ||- | ||
|- | |- | ||
| − | |rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
Latest revision as of 14:35, 16 January 2020
| Fish lifts, screws and locks | |
|---|---|
| Classification | Selection |
| Fish species for the measure | All |
| Does the measure require loss of power production | Operational (requires flow release outside turbine) |
| - | |
| - | |
| Recurrence of maintenance | Irregular at events |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| Movements and migration of fish | |
| Which physical parameter is addressed | Barriers |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Very uncertain |
| Technology readiness level | TRL 7: system prototype demonstration in operational environment |