| Fact box: Bragado | |
|---|---|
| Country | Portugal |
| River | Avelames |
| Operator | HIDROERG |
| Capacity | 3.1 MW |
| Head | 155 m |
| Inter-annual discharge | 1.4 m3/s |
| Turbine(s) | 1 Francis turbine with horizontal shaft |
| Detailed report | Click for pdf |