Difference between revisions of "Template:Tester"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) m (Bendikhansen moved page Tester to Template:Tester) |
||
| (15 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| − | { | + | =Intro= |
| + | =check= | ||
| + | =Check= | ||
| + | {| class="wikitable" | ||
| + | ! Classification !! Selection | ||
| + | |- | ||
| + | |Fish species for the measure||[[Fish species for the measure::All]] | ||
| + | |- | ||
| + | |rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]] | ||
| + | |- | ||
| + | ||[[Does the measure require loss of power production::Operational (requires flow release through turbine)]] | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||Recurrence of maintenance||[[Recurrence of maintenance::Never]] | ||
| + | |- | ||
| + | |rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] | ||
| + | |- | ||
| + | ||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]] | ||
| + | |- | ||
| + | ||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]] | ||
| + | |- | ||
| + | ||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]] | ||
| + | |- | ||
| + | ||[[Which life-stage of fish is measure aimed at::Adult fish]] | ||
| + | |- | ||
| + | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||
| + | |- | ||
| + | |rowspan = "8"|Which physical parameter is mitigated||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||[[Which physical parameter is mitigated::Water velocity]] | ||
| + | |- | ||
| + | ||[[Which physical parameter is mitigated::Water depth]] | ||
| + | |- | ||
| + | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | ||
| + | |- | ||
| + | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
| + | |- | ||
| + | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] | ||
| + | |- | ||
| + | |rowspan = "4"|Section in the regulated system measure is designed for||- | ||
| + | |- | ||
| + | ||- | ||
| + | |- | ||
| + | ||[[Section in the regulated system measure is designed for::Bypass section]] | ||
| + | |- | ||
| + | ||[[Section in the regulated system measure is designed for::Downstream outlet]] | ||
| + | |- | ||
| + | |rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] | ||
| + | |- | ||
| + | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
| + | |- | ||
| + | ||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] | ||
| + | |- | ||
| + | ||Level of certainty in effect||[[Level of certainty in effect::Very certain]] | ||
| + | |- | ||
| + | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||
| + | |} | ||
| + | |||
| + | =Doubletester= | ||
Latest revision as of 13:29, 25 October 2019
Contents
Intro
check
Check
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | Operational (requires flow release outside turbine) |
| Operational (requires flow release through turbine) | |
| - | |
| Recurrence of maintenance | Never |
| Which life-stage of fish is measure aimed at | Spawning / Recruitment |
| Juvenile habitat (0+) | |
| Juvenile habitat (1+) | |
| Juvenile habitat (older than 1+) | |
| Adult fish | |
| Movements of migration of fish | |
| Which physical parameter is mitigated | - |
| - | |
| - | |
| - | |
| - | |
| - | |
| Water velocity | |
| Water depth | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | - |
| - | |
| Bypass section | |
| Downstream outlet | |
| River type implemented | Bypass section |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Very certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |