Difference between revisions of "Template:Placement of spawning gravel in the river"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: minor changes) |
||
| (10 intermediate revisions by the same user not shown) | |||
| Line 12: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]] | ||
|- | |- | ||
| − | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] |
|- | |- | ||
||- | ||- | ||
| Line 20: | Line 20: | ||
||- | ||- | ||
|- | |- | ||
| − | ||- | + | |rowspan="8"|Which physical parameter is addressed||- |
|- | |- | ||
||- | ||- | ||
| − | |||
| − | |||
|- | |- | ||
||- | ||- | ||
|- | |- | ||
| − | + | ||[[Which physical parameter is addressed::Substrate and hyporheic zone]] | |
| − | |||
| − | ||[[Which physical parameter is | ||
|- | |- | ||
||- | ||- | ||
| Line 40: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
| − | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
| − | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] | + | |rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] |
|- | |- | ||
| − | |rowspan = "4"|Section in the regulated system measure is designed for||- | + | |rowspan="4"|Section in the regulated system measure is designed for||- |
|- | |- | ||
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]] | ||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]] | ||
| Line 54: | Line 50: | ||
||[[Section in the regulated system measure is designed for::Downstream outlet]] | ||[[Section in the regulated system measure is designed for::Downstream outlet]] | ||
|- | |- | ||
| − | |rowspan = "3"|River type implemented||[[ | + | |rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]] |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
| Line 63: | Line 59: | ||
|- | |- | ||
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] | ||
| + | |- | ||
| + | ||Cost of solution||See [[Costs of solutions|cost table]] | ||
|} | |} | ||
Latest revision as of 13:48, 9 October 2020
| Classification | Selection |
|---|---|
| Fish species for the measure | Gravel spawners |
| Does the measure require loss of power production | - |
| - | |
| Structural (requires no additional flow release) | |
| Recurrence of maintenance | Less often than yearly |
| Which life-stage of fish is measure aimed at | Spawning / Recruitment |
| - | |
| - | |
| - | |
| Which physical parameter is addressed | - |
| - | |
| - | |
| Substrate and hyporheic zone | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | - |
| Upstream of hydropower plant | |
| Bypass section | |
| Downstream outlet | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| - | |
| Level of certainty in effect | Very certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |
| Cost of solution | See cost table |