Difference between revisions of "Template:Baffle fishways"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: changing available parameters) |
||
| Line 12: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
|- | |- | ||
| − | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||- |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
| − | ||- | + | ||[[Which life-stage of fish is measure aimed at::Adult fish]] |
|- | |- | ||
| − | + | ||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | |
| − | |||
| − | ||[[Which life-stage of fish is measure aimed at:: | ||
|- | |- | ||
| − | ||[[Which | + | |rowspan = "9"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]] |
|- | |- | ||
| − | + | ||[[Which physical parameter is mitigated::Barriers]] | |
|- | |- | ||
||- | ||- | ||
Revision as of 14:58, 13 January 2020
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | Operational (requires flow release outside turbine) |
| - | |
| - | |
| Recurrence of maintenance | Irregular at events |
| Which life-stage of fish is measure aimed at | - |
| - | |
| Adult fish | |
| Movements and migration of fish | |
| Which physical parameter is mitigated | N/A |
| Barriers | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | Up to 20 |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Moderately certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |