Difference between revisions of "Template:Truck transport"
Jump to navigation
Jump to search
(Updating classification tables: changing available parameters) |
(Updating classification tables: changing available parameters) |
||
| Line 10: | Line 10: | ||
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]] | ||[[Does the measure require loss of power production::Structural (requires no additional flow release)]] | ||
|- | |- | ||
| − | ||Recurrence of maintenance||[[Recurrence of maintenance:: | + | ||Recurrence of maintenance||[[Recurrence of maintenance::Never]] |
|- | |- | ||
|rowspan = "4"|Which life-stage of fish is measure aimed at||- | |rowspan = "4"|Which life-stage of fish is measure aimed at||- | ||
| Line 20: | Line 20: | ||
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||
|- | |- | ||
| − | |rowspan = "9"|Which physical parameter is | + | |rowspan = "9"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]] |
| − | |||
| − | ||[[Which physical parameter is | ||
|- | |- | ||
||- | ||- | ||
| Line 38: | Line 36: | ||
||- | ||- | ||
|- | |- | ||
| − | |rowspan = "2"| | + | |rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
Revision as of 11:40, 15 January 2020
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | - |
| - | |
| Structural (requires no additional flow release) | |
| Recurrence of maintenance | Never |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| Movements and migration of fish | |
| Which physical parameter is addressed | Barriers |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| rowspan = "2" | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Moderately certain |
| Technology readiness level | TRL 8: system complete and qualified |