Difference between revisions of "Template:Removal of bank protection"
Jump to navigation
Jump to search
(Updating classification tables: minor formatting fix) |
(Updating classification tables: Adding FIThydro colors) |
||
| Line 1: | Line 1: | ||
{| class="wikitable" | {| class="wikitable" | ||
| + | ! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Removal of bank protection | ||
| + | |- | ||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- | ||
Revision as of 14:35, 16 January 2020
| Removal of bank protection | |
|---|---|
| Classification | Selection |
| Fish species for the measure | All |
| Does the measure require loss of power production | - |
| - | |
| Structural (requires no additional flow release) | |
| Recurrence of maintenance | Never |
| Which life-stage of fish is measure aimed at | Spawning / Recruitment |
| Juveniles | |
| Adult fish | |
| - | |
| Which physical parameter is addressed | - |
| - | |
| - | |
| Substrate and hyporheic zone | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | All |
| Section in the regulated system measure is designed for | - |
| - | |
| Bypass section | |
| Downstream outlet | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Very certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |