Difference between revisions of "Template:Fact box for Guma and Vadocondes"
Jump to navigation
Jump to search
(Creating templates for test-case fact-boxes) |
(Adding pdfs to fact boxes) |
||
Line 22: | Line 22: | ||
| Turbine(s) | | Turbine(s) | ||
| 2 Kaplan turbines at each HPP | | 2 Kaplan turbines at each HPP | ||
+ | |} | ||
+ | | Detailed report | ||
+ | |[[file:testcase_presentation_Guma and Vadocondes.pdf]] | ||
|} | |} |
Revision as of 10:07, 22 January 2020
Fact box: Guma and Vadocondes | |
---|---|
Country | Spain |
River | Duero |
Operator | SAVASA |
Capacity | Guma: 2.25 MW, Vadocondes: 1 MW |
Head | Guma: 8.85 m, Vadocondes: 3.75 m |
Inter-annual discharge | 17.6 m³/s |
Turbine(s) | 2 Kaplan turbines at each HPP |
| Detailed report |File:Testcase presentation Guma and Vadocondes.pdf |}