Template:Complete or partial migration barrier removal
Revision as of 11:40, 15 January 2020 by Maintenance script (talk | contribs) (Updating classification tables: changing available parameters)
| Classification | Selection |
|---|---|
| Fish species for the measure | All |
| Does the measure require loss of power production | - |
| - | |
| Structural (requires no additional flow release) | |
| Recurrence of maintenance | Never |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| Movements and migration of fish | |
| Which physical parameter is addressed | Barriers |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| rowspan = "2" | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | Up to 20 |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Moderately certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |