Difference between revisions of "Template:Cleaning of substrate - ripping, ploughing and flushing"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: Adding FIThydro colors)
(Updating classification tables: minor changes)
Line 1: Line 1:
 
{| class="wikitable"
 
{| class="wikitable"
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Cleaning of substrate - ripping, ploughing and flushing
 
|-
 
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
Line 14: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]]
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juveniles]]
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Adult fish]]
+
||-
 
|-
 
|-
 
||-
 
||-
Line 46: Line 48:
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
 
||[[Section in the regulated system measure is designed for::Bypass section]]
 
||[[Section in the regulated system measure is designed for::Bypass section]]
Line 52: Line 54:
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 60: Line 62:
 
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
+
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Revision as of 12:53, 30 September 2020

Classification Selection
Fish species for the measure Gravel spawners
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
-
-
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 8: system complete and qualified
Cost of solution See cost table