Difference between revisions of "Template:Environmental design of embankments and erosion protection"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor changes)
(Updating classification tables: minor changes)
Line 24: Line 24:
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||-
+
|rowspan = "8"|Which physical parameter is addressed||-
 
|-
 
|-
 
||-
 
||-
Line 30: Line 30:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
+
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
 
|-
 
|-
 
||-
 
||-
Line 36: Line 36:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is mitigated::Water velocity]]
+
||[[Which physical parameter is addressed::Water velocity]]
 
|-
 
|-
||[[Which physical parameter is mitigated::Water depth]]
+
||[[Which physical parameter is addressed::Water depth]]
 
|-
 
|-
 
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]

Revision as of 12:21, 2 July 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
Substrate and hyporheic zone
-
-
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment