Difference between revisions of "Template:Fact box for Guma and Vadocondes"

From FIThydrowiki
Jump to navigation Jump to search
Line 24: Line 24:
 
|-
 
|-
 
| Detailed report
 
| Detailed report
|[[file:testcase_presentation_Guma and Vadocondes.pdf|testcase_presentation_Guma and Vadocondes.pdf]]Click for pdf
+
|[[file:testcase_presentation_Guma and Vadocondes.pdf|Click for pdf]]
 
|}
 
|}

Revision as of 08:37, 27 January 2020

Fact box: Guma and Vadocondes
Country Spain
River Duero
Operator SAVASA
Capacity Guma: 2.25 MW, Vadocondes: 1 MW
Head Guma: 8.85 m, Vadocondes: 3.75 m
Inter-annual discharge 17.6 m³/s
Turbine(s) 2 Kaplan turbines at each HPP
Detailed report File:Testcase presentation Guma and Vadocondes.pdf