Difference between revisions of "Template:Fish guidance structures with narrow bar spacing"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor changes)
 
(Updating classification tables: minor changes)
 
(3 intermediate revisions by the same user not shown)
Line 10: Line 10:
 
||-
 
||-
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]]
+
||Recurrence of maintenance||[[Recurrence of maintenance::Yearly]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
|-
 
||-
 
|-
 
||-
 
 
|-
 
|-
 
||-
 
||-
Line 24: Line 20:
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
+
|rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 40: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
||-
+
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Up to 10]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
+
|rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
 
||-
 
||-
Line 54: Line 50:
 
||-
 
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 63: Line 59:
 
|-
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 15:31, 26 January 2021

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Yearly
Which life-stage of fish is measure aimed at -
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for Up to 10
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table