Difference between revisions of "Template:Other types of fine screens"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Updating classification tables: changing available parameters)
Line 2: Line 2:
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::0]]
+
|Fish species for the measure||[[Fish species for the measure::All]]
 
|-
 
|-
|rowspan = "3"|Does the measure require loss of power production||-
+
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|-
 
|-
 
||-
 
||-
Line 10: Line 10:
 
||-
 
||-
 
|-
 
|-
#N/A
+
||Recurrence of maintenance||[[Recurrence of maintenance::Weekly]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
 
|-
 
|-
 
||-
 
||-
Line 18: Line 18:
 
||-
 
||-
 
|-
 
|-
||-
+
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
|-
 
||-
 
 
|-
 
|-
||-
+
|rowspan = "9"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
+
||[[Which physical parameter is mitigated::Barriers]]
 
|-
 
|-
 
||-
 
||-
Line 40: Line 38:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||-
+
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
||-
+
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
#N/A
+
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||-
+
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
 
||-
 
||-
Line 54: Line 52:
 
||-
 
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||-
+
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
|-
||-
+
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
|-
 
|-
||-
+
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
|-
#N/A
+
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 
|-
 
|-
#N/A
+
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
|}
 
|}

Revision as of 14:58, 13 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Weekly
Which life-stage of fish is measure aimed at -
-
-
Movements and migration of fish
Which physical parameter is mitigated N/A
Barriers
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment