Difference between revisions of "Template:Sensory, behavioural barriers (electricity, light, sound, air-water curtains)"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: minor formatting fix)
(Updating classification tables: minor changes)
 
(4 intermediate revisions by the same user not shown)
Line 18: Line 18:
 
||-
 
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
+
|rowspan="8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 36: Line 36:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan="2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
+
|rowspan = "1"|Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
+
|rowspan="4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 
|-
 
|-
 
||-
 
||-
Line 59: Line 59:
 
|-
 
|-
 
||Technology readiness level||[[Technology readiness level::TRL 4: technology validated in lab]]
 
||Technology readiness level||[[Technology readiness level::TRL 4: technology validated in lab]]
 +
|-
 +
||Cost of solution||See [[Costs of solutions|cost table]]
 
|}
 
|}

Latest revision as of 13:48, 9 October 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at -
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very uncertain
Technology readiness level TRL 4: technology validated in lab
Cost of solution See cost table