Difference between revisions of "Template:Skimming wall (fixed or floating)"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: changing available parameters)
(Updating classification tables: minor changes)
 
(4 intermediate revisions by the same user not shown)
Line 10: Line 10:
 
||-
 
||-
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
+
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||-
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 
|-
 
|-
 
||-
 
||-
Line 18: Line 18:
 
||-
 
||-
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
+
||-
 
|-
 
|-
|rowspan = "9"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]]
+
||-
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 +
|-
 +
|rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]]
 
|-
 
|-
 
||-
 
||-
Line 36: Line 40:
 
||-
 
||-
 
|-
 
|-
|rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]]
+
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
Line 42: Line 46:
 
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
+
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
 
||-
 
||-
Line 50: Line 54:
 
||-
 
||-
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||-
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
Line 58: Line 62:
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 8: system complete and qualified]]
+
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
|}
 
|}

Latest revision as of 12:21, 2 July 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
-
-
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is addressed N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment