Skimming wall (fixed or floating)
 +
{| class="wikitable"
 +
! Classification !! Selection
 +
|-
 +
|Fish species for the measure||[[Fish species for the measure::All]]
 +
|-
 +
|rowspan = "3"|Does the measure require loss of power production||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]]
 +
|-
 +
|rowspan = "6"|Which life-stage of fish is measure aimed at||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 +
|-
 +
|rowspan = "8"|Which physical parameter is mitigated||[[Which physical parameter is mitigated::N/A]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 +
|-
 +
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 +
|-
 +
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 +
|-
 +
|rowspan = "4"|Section in the regulated system measure is designed for||[[Section in the regulated system measure is designed for::In dam/power plant]]
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
|rowspan = "3"|River type implemented||-
 +
|-
 +
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 +
|-
 +
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 +
|-
 +
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 +
|-
 +
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|}

Revision as of 09:15, 28 October 2019

Skimming wall (fixed or floating)

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
-
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at -
-
-
-
-
Movements of migration of fish
Which physical parameter is mitigated N/A
-
-
-
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for In dam/power plant
-
-
-
River type implemented -
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment