Template:Suitable measures for Bedload monitoring system

From FIThydrowiki
Revision as of 14:00, 9 October 2020 by Maintenance script (talk | contribs) (Importing MTD properties)
Jump to navigation Jump to search
By-passing sediments Cleaning of substrate - ripping, ploughing and flushing Complete or partial migration barrier removal Construction of a 'river-in-the-river' Drawdown reservoir flushing Environmental design of embankments and erosion protection Mechanical removal of fine sediments (dredging) Migration barrier removal Minimizing sediment arrival to reservoir Mitigating reduced flood peaks, magnitudes, and frequency Off-channel reservoir storage Placement of spawning gravel in the river Placement of stones in the river Removal of weirs Sediment sluicing Altusried||- Freudenau||Yes Schiffmühle||Yes
Relevant measures
Relevant test cases Applied in test case?