Search results

Jump to navigation Jump to search
  • ...the project, costs associated with mitigation according to the categories of habitat, fish migration, sediment and flow were collected by consulting FIT ...igation measures. The values should therefore be interpreted as the ranges of costs for measures, rather than precise costs. The range estimates are base
    16 KB (2,008 words) - 14:06, 9 October 2020
  • ...e:wsf_crosswall.png|thumb|250px|Figure 2: Dimensions of typical cross-wall of a vertical slot fishway]] ...having two slots is to be able to increase the flow in the device, instead of an attraction flow injection system or to compensate a moderate head drop a
    9 KB (1,440 words) - 10:40, 26 January 2021
  • [[File:habitatZones.png|thumb|500px|Figure 1: Physical properties of rivers affecting the physical habitat conditions]] ...ffecting the physical habitat of fish in running waters. The understanding of processes affecting these factors is central in understanding how hydropowe
    4 KB (697 words) - 13:22, 27 October 2020
  • ...rovements to the wiki. Not all of them can be implemented within the scope of the FIThydro project, but the wiki development and maintenance will continu Add articles for removal of bank protection and removal of debris (sediment measures).
    1 KB (232 words) - 14:47, 26 January 2021
  • ...ur in rivers where hydropower regulation has introduced dramatic reduction of discharge levels compare to the natural flow conditions. ...imarily developed to address loss of reservoir capacity and avoid the flow of fine sediments through turbines. If carefully applied, these
    5 KB (670 words) - 10:03, 26 October 2020
  • ...lmon and trout, while it often has reduced functionality for other species of fishes and juvenile fish. Benthos usually cannot pass through pool type fis ...frost. Monitoring facilities should basically be planned in the upper part of the fishway.
    5 KB (788 words) - 10:01, 26 October 2020
  • .... 2010, Environment Agency 2011 and DWA 2014). More details for the design of eel passages can be found in (Environment Agency 2011 and 2017). ...frost. Monitoring facilities should basically be planned in the upper part of the fishway.
    5 KB (771 words) - 10:02, 26 October 2020
  • ...l, passes is also referred to as countercurrent fishways since it consists of special deflectors that lead to helical countercurrent currents, high energ ...frost. Monitoring facilities should basically be planned in the upper part of the fishway.
    4 KB (540 words) - 10:03, 26 October 2020