Template:Mitigating rapid, short-term variations in flow (hydro-peaking operations)

From FIThydrowiki
Jump to navigation Jump to search
Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
-
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements of migration of fish
Which physical parameter is addressed -
-
-
-
-
-
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment
Cost of solution See cost table