Search results

Jump to navigation Jump to search
  • ...s in the EU. It required the EU to fulfil at least 20% of its total energy needs with renewables by 2020 – to be achieved through the attainment of indivi Hydro-peaking Switzerland: hydropeaking needs to be mitigated by 2030. Structural or operational measures can be applied.
    26 KB (3,617 words) - 15:57, 11 August 2020
  • *To add an article to this category, add the "Needs improvement" category at the bottom along with the other categories. <categorytree mode="pages" depth=0 namespaces="Main Category">Needs improvement</categorytree>
    1 KB (232 words) - 14:47, 26 January 2021
  • ...uires heavy lifting equipment and both fixing and placing of the structure needs to be done when the hydropower plant is brought to full stop. Installation ...Downstream fish migration measures]][[category:Solutions]][[category:Needs improvement]]
    4 KB (673 words) - 10:01, 26 October 2020
  • ...review of existing mitigation measures from which point the decision maker needs to identify what alternative options would be appropriate and potentially m ...f existing mitigation measures that the hazard definitely requires further improvement on mitigation. To enable the user to make informed decisions and selections
    10 KB (1,542 words) - 11:53, 27 October 2020
  • [[Category: Types of problems]][[category:Needs improvement]]
    5 KB (718 words) - 12:33, 26 October 2020
  • ...f weirs is just the first start of the measure, and must be followed up by improvement of substrate, creation of a river-in-river, etc. ...ools are available for such analysis with different functionality and data needs, ranging from more simplistic 1-dimensional (1D) hydraulic tools, to highly
    5 KB (776 words) - 10:04, 26 October 2020
  • [[category:Needs improvement]]
    3 KB (383 words) - 19:49, 30 September 2020
  • ...Downstream fish migration measures]][[category:Solutions]][[Category:Needs improvement]]
    13 KB (1,903 words) - 10:03, 26 October 2020
  • ...Downstream fish migration measures]][[category:Solutions]][[category:Needs improvement]]
    4 KB (667 words) - 15:01, 26 January 2021
  • ...Downstream fish migration measures]][[category:Solutions]][[category:Needs improvement]]
    5 KB (823 words) - 10:00, 26 October 2020
  • ...Downstream fish migration measures]][[category:Solutions]][[Category:Needs improvement]]
    5 KB (663 words) - 10:02, 26 October 2020
  • [[Category:Devices]][[Category:Enhanced in FIThydro]][[category:Needs improvement]]
    7 KB (952 words) - 13:04, 30 September 2020
  • | style="text-align:left;" | Switzerland: hydropeaking needs to be mitigated by 2030. Structural or operational measures can be applied. | style="text-align:left;" | Switzerland: revitalization and improvement of morphology is required by 2090.
    6 KB (786 words) - 14:49, 14 September 2020