Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 20 results in range #71 to #90.
View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)
- Mitigating reduced annual flow and low flow measures
- Mitigating reduced flood peaks, magnitudes, and frequency
- Mitigation requirements for hydropower plants
- Monitoring facilities
- National legislation
- Nature-like fishways
- Off-channel reservoir storage
- OpenFOAM
- Operational measures (turbine operations, spillway passage)
- Other measures to improve downstream fish migration
- Other types of fine screens
- Particle image velocimetry (PIV)
- Placement of dead wood and debris
- Placement of spawning gravel in the river
- Placement of stones in the river
- Policy and public acceptance
- Pool-type fishways
- Privacy policy
- Public acceptance of hydropower and hydropower technologies
- Radio frequency identification with passive integrated transponder (PIT tagging)