'''Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020''' | '''Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020''' | ||
=Introduction= | =Introduction= | ||
| + | [[file:vertical_slot_fishway_square.jpg|Figure 1: Vertical slot fishway in Chatellerault, France. | ||
=[[Methods, tools, and devices]]= | =[[Methods, tools, and devices]]= | ||
Revision as of 09:06, 26 October 2020
This technology has been enhanced in the FIThydro project! See Innovative technologies from FIThydro for a complete list.
Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020
Contents
Introduction
[[file:vertical_slot_fishway_square.jpg|Figure 1: Vertical slot fishway in Chatellerault, France.
Methods, tools, and devices
During planning
During implementation
During operation
Relevant MTDs and test cases
Classification table
| Classification | Selection |
|---|---|
| Fish species for the measure | 0 |
| Does the measure require loss of power production | Operational (requires flow release outside turbine) |
| - | |
| - | |
| Recurrence of maintenance | Irregular at events |
| Which life-stage of fish is measure aimed at | - |
| - | |
| - | |
| Movements of migration of fish | |
| Which physical parameter is addressed | N/A |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| - | |
| Hydropower type the measure is suitable for | Plant in dam |
| Plant with bypass section | |
| Dam height (m) the measure is suitable for | Up to 10 |
| Section in the regulated system measure is designed for | In dam/power plant |
| - | |
| - | |
| - | |
| River type implemented | Steep gradient (up to 0.4 %) |
| Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
| Slow flowing, lowland, sandy (less than 0.05 %) | |
| Level of certainty in effect | Very certain |
| Technology readiness level | TRL 9: actual system proven in operational environment |
| Cost of solution | See cost table |