Difference between revisions of "Template:Tester"

From FIThydrowiki
Jump to navigation Jump to search
Line 9: Line 9:
 
! Classification !!  
 
! Classification !!  
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::All]] [[Fish species for the measure::All| ]]
+
|Fish species for the measure||[[Fish species for the measure::All]]
 
|-
 
|-
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]] [[Does the measure require loss of power production::Operational (requires flow release outside turbine)| ]]
+
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 
|-
 
|-
|[[Does the measure require loss of power production::Operational (requires flow release through turbine)]] [[Does the measure require loss of power production::Operational (requires flow release through turbine)| ]]
+
|[[Does the measure require loss of power production::Operational (requires flow release through turbine)]]
 
|-
 
|-
 
|
 
|
 
|-
 
|-
||Recurrence of maintenance||[[Recurrence of maintenance::Never]] [[Recurrence of maintenance::Never| ]]
+
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] [[Which life-stage of fish is measure aimed at::Spawning / Recruitment| ]]
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]] [[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)| ]]
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]] [[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)| ]]
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]] [[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)| ]]
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Adult fish]] [[Which life-stage of fish is measure aimed at::Adult fish| ]]
+
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] [[Which life-stage of fish is measure aimed at::Movements of migration of fish| ]]
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
 
|rowspan = "7"|Which physical parameter is mitigated||
 
|rowspan = "7"|Which physical parameter is mitigated||
Line 41: Line 41:
 
||
 
||
 
|-
 
|-
||[[Which physical parameter is mitigated::Water velocity]] [[Which physical parameter is mitigated::Water velocity| ]]
+
||[[Which physical parameter is mitigated::Water velocity]]
 
|-
 
|-
||[[Which physical parameter is mitigated::Water depth]] [[Which physical parameter is mitigated::Water depth| ]]
+
||[[Which physical parameter is mitigated::Water depth]]
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] [[Hydropower type the measure is suitable for::Plant in dam| ]]
+
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
||[[Hydropower type the measure is suitable for::Plant with bypass section]] [[Hydropower type the measure is suitable for::Plant with bypass section| ]]
+
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]] [[Dam height (m) the measure is suitable for::All| ]]
+
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
 
|rowspan = "3"|Section in the regulated system measure is designed for||
 
|rowspan = "3"|Section in the regulated system measure is designed for||
 
|-
 
|-
||[[Section in the regulated system measure is designed for::Bypass section]] [[Section in the regulated system measure is designed for::Bypass section| ]]
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||[[Section in the regulated system measure is designed for::Downstream outlet]] [[Section in the regulated system measure is designed for::Downstream outlet| ]]
+
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]] [[River type implemented::Steep gradient (up to 0.4 %)| ]]
+
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 
|-
 
|-
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] [[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)| ]]
+
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
|-
 
|-
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]] [[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)| ]]
+
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
|-
||Level of certainty in effect||[[Level of certainty in effect::Very certain]] [[Level of certainty in effect::Very certain| ]]
+
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 
|-
 
|-
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] [[Technology readiness level::TRL 9: actual system proven in operational environment| ]]
+
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
|}
 
|}

Revision as of 13:54, 14 October 2019

Heading text

 Hydropower type the measure is suitable for
Baffle fishwaysPlant in dam
Plant with bypass section
Bottom-type intakes (Coanda screen, Lepine water intake, etc)Plant in dam
Plant with bypass section
By-passing sedimentsPlant in dam
Plant with bypass section
Bypass combined with other solutionsPlant in dam
Plant with bypass section
Cleaning of substrate - ripping, ploughing and flushingPlant in dam
Plant with bypass section
Complete or partial migration barrier removalPlant in dam
Plant with bypass section
Construction of a 'river-in-the-river'Plant in dam
Plant with bypass section
Construction of off-channel habitatsPlant in dam
Plant with bypass section
Drawdown reservoir flushingPlant in dam
Plant with bypass section
Environmental design of embankments and erosion protectionPlant in dam
Plant with bypass section
Fish guidance structures with narrow bar spacingPlant in dam
Plant with bypass section
Fish guidance structures with wide bar spacingPlant in dam
Plant with bypass section
Fish lifts, screws, locks, and othersPlant in dam
Plant with bypass section
Fish-friendly turbinesPlant in dam
Plant with bypass section
Fishways for eels and lampreysPlant in dam
Plant with bypass section
Mechanical removal of fine sediments (dredging)Plant in dam
Plant with bypass section
Migration barrier removalPlant in dam
Plant with bypass section
Minimizing sediment arrival to reservoirPlant in dam
Plant with bypass section
Mitigating rapid, short-term variations in flow (hydro-peaking operations)Plant in dam
Plant with bypass section
Mitigating reduced annual flow and low flow measuresPlant in dam
Plant with bypass section
Mitigating reduced flood peaks, magnitudes, and frequencyPlant in dam
Plant with bypass section
Nature-like fishwaysPlant in dam
Plant with bypass section
Off-channel reservoir storagePlant in dam
Plant with bypass section
Operational measures (turbine operations, spillway passage)Plant in dam
Plant with bypass section
Other types of fine screensPlant in dam
Plant with bypass section
Placement of dead wood and debrisPlant in dam
Plant with bypass section
Placement of spawning gravel in the riverPlant in dam
Plant with bypass section
Placement of stones in the riverPlant in dam
Plant with bypass section
Pool-type fishwaysPlant in dam
Plant with bypass section
Removal of weirsPlant in dam
Plant with bypass section
Restoration of the riparian zone vegetationPlant in dam
Plant with bypass section
Sediment sluicingPlant in dam
Plant with bypass section
Sensory, behavioural barriers (electricity, light, sound, air-water curtains)Plant in dam
Plant with bypass section
Skimming walls (fixed or floating)Plant in dam
Plant with bypass section
Truck transportPlant in dam
Plant with bypass section
Vertical slot fishwaysPlant in dam
Plant with bypass section

All

Classification
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is mitigated
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment